Projects
| S.No. | Name and Brief Description of The Project | Clients | Consultants | Nature of Works | Year | Project Cost Rs. |
|---|---|---|---|---|---|---|
| 1 | Febrication & Erection of Steel Shed Near New Mill Fumace Oil & Fixing of G.I. Sheet, AC Sheets. | "Metropoli tan Steel Corporati on Ltd. " | "National Engineering Services Pvt Ltd " | Steel Structure | 1991 | 500,000 |
| 2 | Civil Works of Waste Water Treatment Plant, Karachi-Sindh. | BASF | Zishan Engineers (Pvt) Ltd | Water Retaining Structure | 1991 | 2,150,000 |
| 3 | Construction of Monomer Ware House, Karachi-Sindh. | BASF | ESCON (Pvt) Ltd | Steel Structure | 1991 | 4,000,000 |
| 4 | Construction of Internal Roads and Drainage Works. | BASF | Nazim Associates | Runwaways / Roads | 1991 | 4,900,000 |
| 5 | Construction of Factory Office Building Inside Road etc at Hub Balochistan. | Pakistan National Chemical Industries (Pvt) Ltd | Ghani Associates | Building / Heavy Structures | 1991-92 | 6,550,000 |
| 6 | Construction of Air Strip. | Engro Chemical Pakistan Ltd. | Progressive Pvt Ltd | Runwaways / Roads | 1992 | 4,500,000 |
| 7 | Construction of Foundations for Hub-Jamshoro. 500 KVA Transformer Line, Jamshoro-Sindh. | Water & Power Develop Authority, (WAPDA) ICC (Pvt) Ltd | NESPAK Lahore | Building / Heavy Structures | 1994 | 45,000,000 |
| 8 | NRL Revamp-II Project. Civil Construction Works. | National Refinery Limited | ENAR Petrotech Services (Pvt) Ltd | Refineries / Oil Terminals | 1993-95 | 4,000,000 |
| 9 | Product Movement & Shipment Faclities PM & S I&II, Dharki-Sindh. | Engro Chemical Pakistan Ltd | Progressive Consultants | Petro Chemical | 1992-95 | 1992-95 |
| 10 | Balancing Modernizatin And Rehabilitation of Existing Plant Package-111, Karachi-Sindh. | Peoples Steel Mills Ltd | NESPAK Karachi | Building / Heavy Structures | 1994-95 | 27,470,000 |
| 11 | Commercial Liquid Inks Building Electrical Works Explosion Proof HVAC Works, Karachi-Sindh. | SICPA Inks Pak (Pvt) Ltd | NESPAK Karachi | Building / Heavy Structures | 1996-97 | 14,600,000 |
| 12 | "Constructin of 35 KT Additional Urea Bulk Storage Facility, Dharki-Sindh." | ENGRO Chemical Pakistan Ltd | Progressive Consultants | Steel Structure / Petro Chemical | 1996-97 | 73,500,000 |
| 13 | Construction of Cooling Tower, Dharki-Sindh. | ENGRO Chemical Pakistan Ltd | Progressive Consultants | Heavy Structure / Petro Chemical | 1997 | 8,500,000 |
| 14 | Construction of ACES Structure, Dharki-Sindh. | ENGRO Chemical Pakistan Ltd | PT Pupak Sriwidjat A Engineering & Construction Division Palemang, Indonesia | Heavy Structure / Petro Chemical | 1997 | 24,100,000 |
| 15 | Construction of Roads & Bridges Hyderabad By-Pass Project. | "Sachal Engineering Works (Pvt) Ltd. Sub-Contractor" | A.A. Associates | Runwaways / Roads | 1998 | 24,000,000 |
| 16 | Construction of 10KM Highway, Causeway and Box Culverts-Sohrab Besima Road. | "Government of Balochistan. Hanbo Steel. Sub-Contractor" | --- | Runwaways / Roads | 1997 | 20,000,000 |
| 17 | PM&S II, III & Bulk Building Mechanical, Electrical Equipment Erection Electrical & Instrumentation Works. | Engro Chemical Pakistan Ltd | NOVA Italy | Petro Chemical | 1998 | 14,000,000 |
| 18 | Construction of Oil Terminal HSD Tank, Pipe Lines and Internal Roads, Shikarpur-Sindh. | Caltex Oil Pakistan Ltd | Caltex Oil Pak Ltd. | Refineries / Oil Terminals | 1997-98 | 11,811,000 |
| 19 | PM&S Revamp Project, Dharki-Sindh. | ENGRO Chemical Pakistan Ltd. | Progressive Consultants | Petro Chemical | 1998 | 11,250,000 |
| 20 | Constructoin of Access Road and Security Check Post. | ENGRO Chemical Pakistan Ltd. | Engineering Consultants International (Pvt) Ltd | Runwaways / Roads | 1998-99 | 15,700,000 |
| 21 | Construction of R.O. Tank. | Asia Petroleum Ltd. | --- | Refineries / Oil Terminals | 1998-99 | 708,000 |
| 22 | Construction of Jail Road - Lahore. | National Logistic Cell | --- | Runwaways / Roads | 1999 | 3,500,000 |
| 23 | "Design / Construction of Administration Block at Jamshoro-Sindh." | Clariant Pakistan Ltd | Designed By Jammy Constructors (Pvt) Ltd | Building / Heavy Structures | 1999-01 | 12,770,000 |
| 24 | "Construction of Storage Tank Foundation I Puri Terminal at Port Qasim." | I Puri Terminal Ltd | Zishan Engineers (Pvt) Ltd | Refineries / Oil Terminals | 2000 | 2,650,000 |
| 25 | "Construction of Office Building, Ware House, Boundary Wall, Laboratory Building & Misc. Structure." | Caltex Oil Pakistan Ltd | Mushtaq & Bill | Building / Heavy Structures | 2000-01 | 20,000,000 |
| 26 | "Civil Works of Process & Utility Area and Tank Farm Area, at Bosicor Refinery, Hub Balochistan." | Bosicor Refinery Ltd | "Siemens Pakistan Engineering Company Ltd. Zishan Engineer (Pvt) Ltd." | Refineries / Oil Terminals | 2000-01 | 9,000,000 |
| 27 | "Construction of Oil Terminal Ware House and Calibration Unit, Tanks Sheikhupra Punjab." | Caltex Oil Pakistan Ltd | Mushtaq & Bill | Petro Chemical | 2001 | 6,000,000 |
| 28 | Construction of Bridges Makran Coastal Highway, Balochistan. | National Highway Authority | National Highway Authority | Runwaways / Roads | 2001 | 20,000,000 |
| 29 | "Construction of Air Strip at Distric Dadu-Sindh. Construction of Air Strip Bhit Sehwan Sindh." | LAMSO-ENI Pakistan Ltd. (Sub-Contractor) | "HALCROW Pak Consultant. Saita Pakistan Pte Ltd. (Main Contractor)" | Runwaways / Roads | 2002 | 100,000,000 |
| 30 | Construction of Scrap Bay Manghopir Karachi. | Peoples Steel Mills Ltd | NESPAK Karachi | Building / Heavy Structures | 2002 | 9,000,000 |
| 31 | "Civil Works for Qadirpur Capacity Enhancement Project, Qadirpur Sindh." | Siemens / OGDC | ENAR Petrotech Services (Pvt) Ltd | Petro Chemical | 2002-03 | 16,980,000 |
| 32 | "Repair of Taxiway & Miscellaneous Buildings, Jacobabad, Shahbaz Air Base." | US Centcom AICI / Syska Archirodon LLC | Design / Construction By Jammy Constructors (Pvt) Ltd | Runwaways / Roads | 2005 | 1,850,000 |
| 33 | "Qasim Access Road / HLZ Construction Soil Stabilization. Dhamial Air Base, Rawalpindi - Punjab." | US Army Centcom | Design / Construction By Jammy Constructors (Pvt) Ltd | Runwaways / Roads | 2005 | 505,000 |
| 34 | Construction of Ingate House with Booths at Qasim International Container Terminal. | QICT | NESPAK Karachi | Building / Heavy Structures | 2006-07 | 57,990,000 |
| 35 | Edible Oil Refinery Project at Port Qasim. | IFFCO Pakistan (Pvt) Ltd | Zishan Engineers (Pvt) Ltd | Refineries / Oil Terminals | 2006-07 | 225,000,000 |
| 36 | "Additional Civil Works, Edible Oil Refinery Expansion Project at Port Qasim." | IFFCO Pakistan (Pvt) Ltd | Zishan Engineers (Pvt) Ltd | Refineries / Oil Terminals | 2006-07 | 16,000,000 |
| 37 | " Construction of In-Gate House Container Terminal at Berth 6-9, East Wharf, Karachi Port Package 10: Sub Station # 2 (Ground + Four Storey Building). " | Pakistan International Container Terminal. | NESPAK Karachi | Building / Heavy Structures | 2008 | 11,000,000 |
| 38 | " Construction of Boundary Wall at QICT Premnager Dry Port Yard Lahore. " | QICT | NESPAK Lahore | Building / Heavy Structures | 2008-09 | 19,421,000 |
| 39 | "Construction of Container Terminal at Berth 6-9, East Wharf, Karachi Port Package-9: Document Process Center." | Pakistan International Container Terminal. | NESPAK Karachi | Building / Heavy Structures | 2008-10 | 160,000,000 |
| 40 | "Construction of Gharo Cantonment Perimeter Security, Karachi-Sindh." | US Army Centcom | Design / Construction By Jammy Constructors (Pvt) Ltd | Runwaways / Roads | 2009-10 | 95,686,000 |
| 41 | ENAR Petroleum Refining Facility. | ENAR Petrotech Services (Pvt) Ltd | ENAR Petrotech Services (Pvt) Ltd | Refineries / Oil Terminals | 2009-10 | 160,400,000 |
| 42 | "Construction of Common Facility Building for Custom and Railway Offices at Dry Port, Prem Nagar, Lahore Punjab." | MICT & QICT | E.A Consultant (Pvt) Ltd. | Building / Heavy Structures | 2010-11 | 45,034,000 |
| 43 | Cherat Range Complex at Cherat, KPK-Pakistan. | SSG Turnkey Project | Designed By Jammy Constructors (Pvt) Ltd | Building / Heavy Structures | 2010-11 | 188,000,000 |
| 44 | Construction of Prelays Work at Onshore Sheet Piling Works. | UTL Subsidiary of Byco Petroleum (Pvt) Ltd | Byco Oil Pakistan Limited | Refineries / Oil Terminals | 2010-11 | 27,142,000 |
| 45 | Edible Oil Refinery Project at Port Qasim. | Oil World (Pvt) Ltd | Engineering Consortium (Pvt) Ltd | Refineries / Oil Terminals | 2010-11 | 153,000,000 |
| 46 | Construction of RCC Culverts & Loading Gantry. | Byco Oil Pakistan Ltd. | Byco Oil Pakistan Limited | Refineries / Oil Terminals | 2010-11 | 178,745,000 |
| 47 | Omni Power Station at Badin Road, Matli Sindh. | Orient Energy System (Pvt) Ltd, Karachi. | Zishan Engineers (Pvt) Ltd | Power House | 2011 | 35,000,000 |
| 48 | Dadu Energy (Pvt) Ltd Dadu Sindh. | Orient Energy System (Pvt) Ltd, Karachi. | Zishan Engineers (Pvt) Ltd | Power House | 2011 | 29,480,000 |
| 49 | Leveling and Dressing of Process Area of BOPL. | Byco Oil Pakistan Ltd. | Byco Oil Pakistan Limited | Power House | 2011 | 30,000,000 |
| 50 | Shikarpur Power Plant Project. | Orient Energy System (Pvt) Ltd, Karachi. | Zishan Engineers (Pvt) Ltd | Power House | 2012 | 31,000,000 |
| 51 | "Construction of Time Office & Waiting Area at Oil World Project Site, Port Qasim, Karachi." | Oil World (Pvt) Ltd | Design / Construction By Jammy Constructors (Pvt) Ltd | Building / Heavy Structures | 2012 | 2,229,890 |
| 52 | "Construction of Road Works at Oil World Project at Site, Port Qasim, Karachi." | Oil World (Pvt) Ltd | Design / Construction By Jammy Constructors (Pvt) Ltd | Runwaways / Roads | 2011-12 | 8,860,305 |
| 53 | Construction of Remaining Civil, Electrical & HVAC Works for CMB Block (Operation Building) at Byco. | Byco Oil Pakistan Ltd. | Byco Oil Pakistan Limited | Building / Heavy Structures | 2012 | 51,000,000 |
| 54 | Clifton Villa D-26 & D-27 & Project, DHA-Karachi. | --- | Najmi Bilgrami Associates | Building / Heavy Structures | 2013 | 200,000,000 |
| 55 | Rehabilitation of Kohala Muzaffarabad Road (S-2) Package-1. | "Xinjiang Beixin Road & Bridge Group Co. Ltd (Sub-Contract) / Raja Nake Muhammad & Brothers" | NESPAK | Runwaways / Roads | 2013 | 740,000,000 |
| 56 | Construction Finished Material Production Shed & Allied Works. | Peoples Steel Mills Ltd | NESPAK | Building / Heavy Structures | 2014-16 | 137,500,000 |
| 57 | Construction of Foundation for DME at Seamless Tube Mill. | Peoples Steel Mills Ltd | Peoples Steel Mills Ltd | Building / Heavy Structures | 2017 | 59,652,022 |
| 58 | Crush Plant # 01, Phase-IV. | Bahria Town Karachi | Bahria Town Karachi | Heavy Structure | 2017-18 | 10,940,411 |
| 59 | Crush Plant # 01, Phase-IV. | Bahria Town Karachi | Bahria Town Karachi | Heavy Structure | 2017-18 | 6,015,443 |
| 60 | Grid Station - Ancillary Work (Electrical). | Bahria Town Karachi | Bahria Town Karachi | Heavy Structure | 2018 | 7,418,500 |
| 61 | Ancillary Building - Phase-III (MEP Works). | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2018 | 19,365,750 |
| 62 | Crush Plant # 02, Phase-II. | Bahria Town Karachi | Bahria Town Karachi | Heavy Structure | 2018 | 14,429,223 |
| 63 | Crush Plant # 01, Phase-IV (Electrical). | Bahria Town Karachi | Bahria Town Karachi | Heavy Structure | 2018 | 850,650 |
| 64 | Crush Plant # 01, Phase-IV (MEP Work). | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2016-18 | 2,635,750 |
| 65 | Labour Accomodation. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2014-16 | 118,259,100 |
| 66 | Asphalt Plant. | Bahria Town Karachi | Bahria Town Karachi | Heavy Structure | 2014-15 | 5,487,478 |
| 67 | Finishing - Labour Accomodation | Bahria Town Karachi | Bahria Town Karachi | Buildings | 2015 | 89,979,750 |
| 68 | Workshop Phase-I. | Bahria Town Karachi | Bahria Town Karachi | Buildining / Steel Structures | 2014-15 | 26,593,989 |
| 69 | Green Valley Mart. | Bahria Town Karachi | Bahria Town Karachi | Buildining / Steel Structures | 2015-16 | 23,109,707 |
| 70 | Additional Civil Work - Labour Accommodation. | Bahria Town Karachi | Bahria Town Karachi | Buildining / Steel Structures | 2015-16 | 31,080,389 |
| 71 | Golf Course Maintenance Facility - Shed-1. | Bahria Town Karachi | Bahria Town Karachi | Buildining / Steel Structures | 2016 | 28,460,198 |
| 72 | Golf Course Michael Office - Shed-2. | Bahria Town Karachi | Bahria Town Karachi | Buildining / Steel Structures | 2016 | 19,011,183 |
| 73 | Golf Course Warehouse - Shed-3. | Bahria Town Karachi | Bahria Town Karachi | Buildining / Steel Structures | 2016-17 | 25,948,213 |
| 74 | Golf Course Warehouse - Shed-3 (MEP). | Bahria Town Karachi | Bahria Town Karachi | Buildining / Steel Structures | 2017 | 350,500 |
| 75 | Golf Course Wet Well. | Bahria Town Karachi | Bahria Town Karachi | Heavy Structures | 2016 | 6,352,945 |
| 76 | Golf Course Labour & Supervisor Mess. | Bahria Town Karachi | Bahria Town Karachi | Buildings | 2016-17 | 11,833,760 |
| 77 | Mosque Midway Commercial. | Bahria Town Karachi | Bahria Town Karachi | Buildings | 206-18 | 56,734,692 |
| 78 | Additional Work - Mosque Midway Commercial. | Bahria Town Karachi | Bahria Town Karachi | Buildings | 2017 | 4,027,158 |
| 79 | Golf Course - Power House. | Bahria Town Karachi | Bahria Town Karachi | Power House | 2016 | 15,627,890 |
| 80 | Grid Station. | Bahria Town Karachi | Bahria Town Karachi | Heavy Sturcture | 2016-18 | 259,231,421 |
| 81 | Golf Course - MEP Material Advance - Shed-2. | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2016 | 4,003,556 |
| 82 | Sewerage Water Treatment Plant. | Bahria Town Karachi | Bahria Town Karachi | Water Retaining Structure | 2017 | 106,338,554 |
| 83 | MEP - Sewerage Water Treatment Plant. | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2017-18 | 3,582,500 |
| 84 | Additional Work - Sewerage Water Treatment Plant. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2017 | 5,282,174 |
| 85 | UGWT - Sewerage Water Treatment Plant. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2018 | 4,199,410 |
| 86 | Golf Couse Warehouse - Shed-3, Boundary Wall. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2016-17 | 19,681,975 |
| 87 | MEP - Golf Course Michael Office - Shed-1. | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2017 | 5,093,630 |
| 88 | MEP - Golf Course Michael Office - Shed-2. | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2017 | 2,431,150 |
| 89 | Golf Course New Wet Well. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2017 | 8,138,200 |
| 90 | Golf Course Under Ground Water Tank. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2017 | 8,070,246 |
| 91 | Golf Course Warehouse - Shed-3 (Additional Work of Boundary Wall). | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2017 | 797,365 |
| 92 | MEP - Golf Course Labour & Supervisor Mess. | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2017 | 1,603,125 |
| 93 | Golf Course New Wet Well Steel Structure. | Bahria Town Karachi | Bahria Town Karachi | Steel Structure | 2017-18 | 1,161,937 |
| 94 | STP - Under Ground Water Tank & External Sewerage. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2018 | 4,199,410 |
| 95 | Construction of Rice Syrup & Sorbitol Manufacturing Facility at Nooriabad - Phase-1. | "ACT Polyols (Pvt) Ltd. Consultant Zishan Engineers (Pvt) Ltd." | Zishan Engineers (Pvt) Ltd | Heavy Structures | 2019-20 | 263,500,000 |
| 96 | Workshop # 01 & 02, Phase-III. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2018-19 | 50,177,566 |
| 97 | Ancillary Buildings, Phase-III. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2017-19 | 218,663,200 |
| 98 | Mosque at Farm House. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2017-19 | 118,213,800 |
| 99 | Grid Station - Fire Hydrant & Fire Alarm System. | Bahria Town Karachi | Bahria Town Karachi | Grid Station | 2018 | 24,350,000 |
| 100 | Eiffel Tower Foundation. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2018-19 | 101,447,382 |
| 101 | Grid Station - Power House Building. | Bahria Town Karachi | Bahria Town Karachi | Grid Station | 2018-19 | 131,516,530 |
| 102 | Ancillary Building - Phase-III (MEP Works). | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2018-20 | 19,942,000 |
| 103 | Grid Station - Fire Alarm System (Additional Work). | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2018 | 9,787,379 |
| 104 | Grid Station - Security Surveillance System. | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2018-19 | 9,917,650 |
| 105 | Grid Station - Power House-2. | Bahria Town Karachi | Bahria Town Karachi | Steel Structure / Power House | 2018 | 7,817,277 |
| 106 | Crush Plant # 03, Phase-IV. | Bahria Town Karachi | Bahria Town Karachi | Heavy Structure | 2018-20 | 14,995,764 |
| 107 | Car Lift Hydraulic Equipment. | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2019-20 | 7,763,650 |
| 108 | Finishing - Grid Station. | Bahria Town Karachi | Bahria Town Karachi | Power House | 2017 | 40,410,737 |
| 109 | Electrical - Grid Station 132 & 220 KVA. | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2017-18 | 6,171,000 |
| 110 | MEP - Grid Station - Control House Building. | Bahria Town Karachi | Bahria Town Karachi | MEP Works | 2017-18 | 10,418,500 |
| 111 | Additional Work - Golf Course. | Bahria Town Karachi | Bahria Town Karachi | Building / Heavy Structures | 2017-18 | 2,444,894 |
| 112 | Rice Syrup & Sorbitol Manufacturing Facility at Nooriabad, Phase-2. | ACT Polyols (Pvt) Ltd. | Zishan Engineers (Pvt) Ltd | Heavy Structures. | 2019-20 | 144,602,612 |
| 113 | Repairing & Rnovation of Lecture Halls at Ground & Fourth Floor at JSMU. | JSMU | NESPAK | Building / Refurbishment | 2019 | 33,962,968 |
| 114 | Masjid-e-Rafi. | Bahria Town Karachi | Bahria Town Karachi | Buiuldings | 2019-20 | 56,734,690 |